I-10/Citrus Interchange Project

I-10/Citrus Interchange Project

I-10/Citrus Interchange Improvements Project

DCIM100GOPROFalcon Engineering Services is providing full Construction Management services and field personnel to the San Bernardino Associated Government (SANBAG) on the I-10/Citrus Interchange- $55.3 and I-10/Cherry Interchange- $49.7M Improvement Projects.
Both I-10/Citrus and Cherry Interchange improvements involve the construction of new ramps, loop on ramps, realignment and widening of existing ramps, realignment of existing channels, multi-cell box culverts, trapezoidal and rectangular channels, signalized intersections, local street improvements, Construction of elaborate Retaining Wall/MSE wall systems to support new ramp alignments/widening with unique architectural features and themes. Work will also include relocation of numerous utilities (Edison OH & Underground, water, communication, gas, storm drains and sewer).

Construction includes CIP Box girder bridges (OC), PCPS girder bridges (OH), Driven Piles, CIDH Piles, MSE Walls, Retaining Walls, Massive Shoring- Stage Construction, Unique Architectural Features, UPRR Coordination, Numerous Utility Relocation, AC/PCC/JPCP Paving, Stage Construction (Multiple Stages), Accelerated Schedule (9-Months), Elaborate SWPPP plan & monitoring, PR-Businesses and residents, Coordination with CT/ agencies.

DCIM100GOPRO

Technical Features:

  • UPRR Coordination.
  • CIP Box Girder Bridges.
  • Driven Piles & CIDH Piles.
  • MSE Walls, Retaining Walls.
  • Massive Shoring- Stage Construction.
  • Unique Architectural Features.
  • Numerous Utility Relocation.
  • AC Paving.
  • Stage Construction (Multiple Stages).
  • Accelerated Schedule .

Status:

Completed, No Claims, within Budget and On Time.

Construction Cost:

$55.3M