SR-60/Moreno Beach Drive

SR-60/Moreno Beach Drive

SR-60/Moreno Beach Drive Phase-1 Improvement Project

Moreno beach (1)
The proposed SR-60/Moreno Beach Drive Phase-1 project site is located at the State Route (SR) 60 Interchange and Moreno Beach Drive in the City of  Moreno  Valley,  CA.  The  work  of  this  project  generally  included realigning the SR-60/Moreno Beach eastbound off-and-on-ramps, adding an eastbound auxiliary lane, installation of a new traffic signal at the new intersection of the eastbound ramps and Moreno Beach Drive, adding a retaining wall, adding ramp metering, extension of Eucalyptus Avenue to Moreno Beach Drive, modification of the traffic signal at the intersection of Eucalyptus Avenue and Moreno Beach Drive, coordination of utility relocations, irrigation, and related work.  The work lies within  State of California (Caltrans)  right of way.  The work included earthwork, grading, Asphalt Concrete (AC) paving, concrete retaining walls,    roadway excavation, imported borrow, drainage pipes and minor concrete structures, concrete curb and gutter,   traffic control, signing, striping, traffic and ramp meter signals, irrigation, erosion control, EMWD waterline relocation, overhead SCE relocation, and related work.

 

Our executives visit the Moreno Beach Project:

DSCN4488

DSCN4489

 

 

 

 

 

 

 

 

 

 

Technical Features:

  • Realigning the SR-60?Moreno Beach eastbound off-and-on-ramps.
  • Earthwork, grading, Asphalt Concrete (AC) paving.
  • Coordination of utility relocations. 
  • Concrete Retaining Walls.
  • Drainage pipes, Concrete curb & gutter.
  • EMWD Water Line Relocation.

Status:

Completed, No Claims, within Budget and On Time.

Construction Cost:

$8.4M