Guava St. Bridge @ Murrieta Creek, Murrieta, CA

Client/Owner: City of Murrieta
Start/Completion Date: 10/2016-6/2018
Construction Cost: $4.8M

FALCON Engineering Services (FALCON)  provided construction management and inspection services to the City of Murrieta. The project work was to construct a new Guava Street Bridge and to replace the existing “structurally deficient” Washington Avenue Bridge with new five-span cast-in-place prestressed concrete box girder bridge ~ 1500 ft upstream. Work also consisted of roadway improvements on Washington Avenue approaches, construct roadway approaches improvement on Guava Street between Adams Street and Washington Avenue. Improvement included constructing signalized intersection at Adams Street, ADA compliant ramps, sidewalks, street lighting, 40’ wide AC paved travel way 2×12’ lanes with 8’ shoulders.