Date Palm drive Bridge Improvement, City of Cathedral City, CA
Client/Owner: City of Cathedral City
Start/Completion Date: 6/2017-10/2018
Construction Cost: $16M
FALCON Engineering Services (FALCON) provided construction management and inspection services for the City of Cathedral City. The site was located at Date Palm Drive in Cathedral City, Riverside County, CA. This project proposed widening the existing bridge from 4 to 6 lanes at Date Palm Drive. The project included bridge construction, bridge modification, roadway improvements, utility improvements, traffic signals, and other electrical improvements.
Work has been performed in a sensitive environment requiring occasional oversight by representatives from the Agua Caliente Band of Cahuilla Indians (Cultural Monitor), Amec Foster Wheeler (Paleontologists), and Coachella Valley Water District.