Guava St. Bridge @ Murrieta Creek, Murrieta, CA
Client/Owner: City of Murrieta
Start/Completion Date: 10/2016-6/2018
Construction Cost: $4.8M
FALCON Engineering Services (FALCON) provided construction management and inspection services to the City of Murrieta. The project was to construct a new Guava Street Bridge and replace the existing “structurally deficient” Washington Avenue Bridge with a new five-span cast-in-place prestressed concrete box girder bridge ~ 1500 ft upstream. Work also consisted of roadway improvements on the Washington Avenue approach and construction of roadway approaches improvement on Guava Street between Adams Street and Washington Avenue. Improvements included constructing signalized intersection at Adams Street, ADA-compliant ramps, sidewalks, street lighting, and a 40’ wide AC paved travel way with 2×12’ lanes with 8’ shoulders.